Preventive Maintenance for the Success of Your Rock Crushing Operation

Lead times for repairing crusher parts are currently at around 10-14 weeks. 

Marion Machine is advising customers to check their boneyards for spare crushers to send to us for maintenance.  We are able to repair the crusher back to factory specifications so they can crush for you with little to no downtime, as having a spare useable crusher at your disposal will nearly eliminate downtime.  Understanding that larger crusher parts take more time to repair, planning ahead is key.

Looking for ways to help reduce wear on your crusher?  Here are a few quick tips that can make all the difference for your operation!

  • Check all oil/lube systems
  • Change manganese
  • Change frame liners
  • Change armguards
  • Any type of guarding should be replaced as required
  • Ensure your crusher runs smoothly by starting it and allowing it to run until the oil is warm before crushing
  • Heavy rust preventative

Speaking of heavy rust preventive, this is a game changing service that Marion Machine offers on most crusher parts.

The rust preventive is placed on the machined surfaces, and maintains the surface until you are ready to use it in the quarry.

Contact our expert team at Marion Machine to keep your operation running smooth and strong all year long!  https://marionmachinellc.com.

Our Metso HP 800 Mainframe had a loose shaft and we re-fit the shaft back to OEM specs with a 2-week-turnaround to get a 3.5-million-ton-plant back up and running.

Christopher Joyce Vulcan Materials of Winston-Salem, NC

We believe in Safety, Integrity, Commitment, Respect, and Excellence.