NEWS & UPDATES

image description

Summer Crusher Maintenance Tips: Keep Your Equipment Running in Hot Weather

READ MORE

Summer is one of the busiest seasons for aggregate producers, but it’s also one of the toughest on crushing equipment. High ambient temperatures, long operating hours, and heavy production demands can place additional stress on engines, hydraulic systems, bearings, and other critical components. A proactive maintenance routine can help prevent overheating, reduce unexpected downtime, and

Maximize Uptime: Join Us for Hands-On Symons Cone Crusher Training at Marion Machine

READ MORE

September 16–17 | Marion, NC At Marion Machine, we know that well-trained operators and maintenance personnel are the first line of defense when it comes to keeping crushers running at peak performance. That’s why we’re excited to host an exclusive Symons Cone Crusher Maintenance and Operation Training event this September 16–17, right here at our

image description

OUR CAPABILITIES

  • Thermal Stress Relief
    • Huge 10,000-cubic-foot furnace easily handles the largest crushers
  • Welding Stations
    • 120-ton capacity and over 20 total units
  • Lathes
    • 50-ton capacity and over 15 lathes in production
  • Boring Mills
    • Over 10 vertical and horizontal boring mills in production
  • Crusher Test Stand
    • Crusher test-stand assures quality of repairs with “no-load” test runs of jaw, cone, gyratory, and impact rock crushers
VIEW CAPABILITIES

Our Metso HP 800 Mainframe had a loose shaft and we re-fit the shaft back to OEM specs with a 2-week-turnaround to get a 3.5-million-ton-plant back up and running.

Christopher Joyce Vulcan Materials of Winston-Salem, NC

We believe in Safety, Integrity, Commitment, Respect, and Excellence.