DCIM100MEDIADJI_0420.JPG

Our Metso HP 800 Mainframe had a loose shaft and we re-fit the shaft back to OEM specs with a 2-week-turnaround to get a 3.5-million-ton-plant back up and running.

Christopher Joyce Vulcan Materials of Winston-Salem, NC

We believe in Safety, Integrity, Commitment, Respect, and Excellence.